Engineering
and Operations Home Page | Completed
Projects | Projects
Under Construction| | Projects
in the Planning Stage | Disaster
Response Information | Water
Testing and Treatment
Engineering and Operations Information
Projects in the Planning Stage
Plant 101
The District plans to re-coat the interior and exterior
of a 1,300,000 gallon reservoir due to age and use. A consultant has
performed an inspection and reported on the condition of the existing
coatings. The design specifications should be completed by December 2007, with painting occurring in early winter 2008.
The reservoir is located in Mountain Shadows, northeast of the intersection
of Seine Avenue and Mountain Top Drive.
|